Friday.
The first trial of the body fitment onto the chassis came as a bit of a relief, time for a beer and to see what the buggy would look like with the new wheels. The bonnet petrol fuel position had been altered so that it was in the middle of the bonnet.
The trials of the previous weeks had begun to show some clearer images of what the buggy was going to look like. What my partner Catherine had seen several weeks before in my garage was starting to take shape and for the first time everything was steaming ahead.
The body work holes where drilled through the chassis to provide bolt holes with which to bolt the body onto the chassis. The original channel washers where cleaned and painted and used on top of the fibreglass and a 8mm stainless bolt with nyloc nuts.
It was time to start looking at cleaning down the paint from the body work and the interior components like the dash board, bumpers and roll bar.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment